Final | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Ben Livingston
|
|
|
the corrections have been made Phone #: ###-#### Inspection requested via web by Benny Arreola
|
Final | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola fresh air in garage needs insulation
|
Rough-in | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola
|
Pressure Test | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola 20lb gas, 5lb flue x3
|