Final | 1/11/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Dianne Maxwell
|
Rough-in | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | FAIL |
Chad Schwendiman
|
|
|
This is a second rough-in inspection for the 8/17/18 inspection. Phone #: ###-#### Inspection requested via web by Dianne Maxwell - Need to complete condensate piping in crawl during rough-in
|
Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Dianne Maxwell please call for 2nd rough in when crawl is compleate per conversation with Chad S.
|
Rough-in | 7/31/2018 | 8/1/2018 | 7/31/2018 | A | CANC |
Eric Strole
|
|
|
Re-Inspection for rough-in Phone #: ###-#### >> Inspection requested via web by Dianne Maxwell Inspection cancelled from web by: Dianne Maxwell
|
Conference | 7/31/2018 | 7/31/2018 | 7/31/2018 | A | DONE |
Chad Schwendiman
|
|
|
|
Pressure Test | 7/31/2018 | 7/31/2018 | 7/31/2018 | A | PASS |
Eric Strole
|
|
|
20 lb gas test & flue tests pass.
|
Rough-in | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Dianne Maxwell-Rough-in not complete. Need to complete crawl. Missind supplys on 1st floor and basement per manual-j. Need to seal all ducts. Need to nailplate dryer exhaust.
|