Final | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Ben Livingston
|
|
|
Alan ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza
|
Rough-in | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Almanza
|
Rough-in | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | FAIL |
Chad Schwendiman
|
|
|
ERIC ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza - Need 1" clearance to combustables from vent pipe. (electrical wires)
|
Rough-in | 7/16/2018 | 7/18/2018 | 7/18/2018 | A | FAIL |
Eric Strole
|
|
|
ERIC ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza-Need to frame in fireplace flue 2nd floor.
|