Final | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Ben Livingston
|
|
|
please call jim before arrival. he needs 20 minutes atleast to meet you there. his phone number is ###-####. this is a final for the hood that is installed. thank you Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
Pressure Test | 7/17/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Ben Livingston
|
|
|
INSTALLER ANAS ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt 20lb gas
|
Final | 7/17/2018 | 7/19/2018 | 7/19/2018 | P | CANC |
Ben Livingston
|
|
|
INSTALLER ANAS ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|