Final | 8/14/2018 | 8/14/2018 | 8/14/2018 | A | PASS |
Jack Reynolds
|
|
|
needed this inspection in the am not pm - 5lb flue pressure test ok- furnace ac coil co ok
|
Final | 8/7/2018 | 8/14/2018 | 8/14/2018 | P | CANC |
Jack Reynolds
|
|
|
Carlon will be there by 10am to do the flue test. Phone #: ###-#### Inspection requested via web by Amber Orr - cancelled this pm inspection and scheduled for am
|
Conference | 8/14/2018 | 8/14/2018 | 8/14/2018 | A | CANC |
Jack Reynolds
|
|
|
needed this inspection in the am not pm
|
Final | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | CANC |
Jack Reynolds
|
|
|
needed to this inspection to be am not pm
|
Final | 7/31/2018 | 8/6/2018 | 8/6/2018 | A | NR |
Jack Reynolds
|
|
|
Tia Phone #: ###-#### need to see 5lb flue pressure test- lineset penetration needs sealed- need to add other on permit for duct work that was added
|