Pressure Test | 8/13/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Troy James
|
|
|
Or call cell ###-#### Phone #: ###-#### Inspection requested via web by George Karcher
|
Final | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Troy James
|
|
|
Or call cell ###-#### Phone #: ###-#### Inspection requested via web by George Karcher
|
Pressure Test | 8/13/2018 | 8/14/2018 | 8/13/2018 | P | CANC |
Troy James
|
|
|
Or call my cell number ###-#### Phone #: ###-#### >> Inspection requested via web by George Karcher Inspection cancelled from web by: George Karcher
|
Pressure Test | 7/25/2018 | 7/26/2018 | 7/26/2018 | P | FAIL |
Troy James
|
|
|
or cell ###-#### Phone #: ###-#### Inspection requested via web by George Karcher The gas line to new RTU is required to be 1"
|