Final | 11/7/2018 | 11/8/2018 | 11/8/2018 | A | PASS |
Brian Scoles
|
|
|
if you could call Rex when you get there that would be great. Phone #: ###-#### Inspection requested via web by Kim Evans- final ok
|
Rough-in | 8/2/2018 | 8/3/2018 | 8/3/2018 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard-20lb gas pressure test ok- R/I ok
|
Rough-in | 8/2/2018 | 8/3/2018 | 8/2/2018 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Devony Bullard Inspection cancelled from web by: Devony Bullard
|
Rough-in | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard - need duct seal at furnace -return flex upstairs has sharp bends at trusses - supply flex into the WIC and bathroom are being pinched by trusses -b vent need 1" clearances into attic and cant see clearnaces on be vent through the floor -north supply run into the living room has supports cutting off flex run - need to see inert tape on gas line - need to see framing finished - would like to see the lineset rough in
|
Pressure Test | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pressure test ok
|