Final | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- gas pipe on roof for two RTU's ok- final ok
|
Pressure Test | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60lb gas pressure ok for two RTU on roof- access was in the rhino gym next door
|