Final | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Brian Scoles
|
|
|
PLEASE CALL OUR LEAD INSTALLER BRAD WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery- furnace gas piping co ok
|
Final | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | CANC |
Brian Scoles
|
|
|
please call our lead installer Brad 30 mins before arrival and if at all possible we would prefer end of day 3-5p, thanks so much Phone #: ###-#### >> Inspection requested via web by Rick Montgomery Inspection cancelled from web by: Rick Montgomery
|
Pressure Test | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | PASS |
Brian Scoles
|
|
|
PLEASE CALL OUR LEAD INSTALLER BRAD WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery- 60lb gas pass
|
Final | 8/14/2018 | 8/15/2018 | 8/14/2018 | P | CANC |
Brian Scoles
|
|
|
please call our lead installer Brad when 30 mins in route. We are also requesting gas pressure test same day at end of day if possible- 3-5p. Phone #: ###-#### >> Inspection requested via web by Rick Montgomery Inspection cancelled from web by: Rick Montgomery
|
Pressure Test | 8/14/2018 | 8/15/2018 | 8/14/2018 | P | CANC |
Brian Scoles
|
|
|
please call our lead installer Brad when 30 mins in route. We are also requesting final mech same day at end of day if possible- 3-5p. Phone #: ###-#### >> Inspection requested via web by Rick Montgomery Inspection cancelled from web by: Rick Montgomery
|