Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberMEC18-04023
StatusFinaled
Name HOBSON FABRICATING CORP
Site Address 8000 S FEDERAL WAY
Project Name 
Customer Numberh9297
ePlanReviewNo
Description
New: BUILDING HVAC / DRY-SIDE
MECHANICAL
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/24/20191/25/20191/25/2019APASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Rough-in1/2/20191/3/20191/3/2019APASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Okay to cover ceiling at showers areas C
Rough-in12/28/201812/28/201812/28/2018PPASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Okay to cover ceiling at area B first floor and rooms adjacent to fitness room second level.
Rough-in12/21/201812/24/201812/24/2018APASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
okay to cover ceiling grid area A


ng grid area A
Rough-in12/11/201812/12/201812/12/2018APASS
DetailsTroy James
###-#### Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
ok to cover ceiling at restrooms area A and C. link approved
Rough-in11/26/201811/27/201811/27/2018APASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Okay shafts first floor, cover ceiling restroom second floor area C. Okay boiler flues
Rough-in11/20/201811/21/201811/21/2018PPART
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
-1st floor area C elevator corridor ok for ceiling cover
- 2nd floor area A and B ok for ceiling cover
- 3rd floor training room and corridor on north east side ok for ceiling cover
Rough-in11/13/201811/14/201811/14/2018PPART
DetailsTroy James
ok access doors to fire dampers second level and ok to cover restroom ceiling at B section
Final11/13/201811/14/201811/13/2018ACANC
DetailsTroy James
Inspection on Micron bldg. 37 second floor bathroom. Requested by John McBride ###-#### Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Rescheduled for afternoon
Rough-in11/9/201811/9/201811/9/2018PPART
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- area c 1st floor unisex bathrooms ok for cover- area c 2nd floor elevator corridors ok for cover also seen access door locations
Rough-in11/2/201811/2/201811/2/2018PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- 3rd floor areas A & B from column L west ok for ceiling tiles register and flex all good- area C 1st floor SW entrance hard lid west wall lobby/desk area ok for sheet rock
Rough-in10/25/201810/26/201810/26/2018APART
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
ok shaft except erv andd shaft 6 and 7
Rough-in10/22/201810/22/201810/22/2018PFAIL
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Framing for fire dampers are not completed or not installed per fire damper installation instructions.
Rough-in10/16/201810/17/201810/17/2018APASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
3rd level ceiling ok to cover at area C
Rough-in10/12/201810/15/201810/15/2018ACANC
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- called number on inspection notes and no one answered-
Rough-in10/4/201810/4/201810/4/2018APASS
DetailsTroy James
Rough-in10/3/201810/3/201810/3/2018PPASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
ok to cover restrooms 3rd floor
Rough-in9/28/201810/1/201810/1/2018AFAIL
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Framing for fire/smoke damper does not meet manufacturer installations. 1 1/2" max space from framing to duct. Correction is for rtu 7 shaft
Rough-in9/20/20189/21/20189/21/2018APART
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Rough-in9/13/20189/14/20189/14/2018APASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
ok ducts in shafts 6,7,3,5,9,11,12,13,15, erv 1
Rough-in9/6/20189/6/20189/6/2018PPART
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Ok to cover shaft 1,2,4,8,10 first floor
Rough-in8/28/20188/28/20188/28/2018PPASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
ok framing bottom of shaft second floor, ok to cover ducts second floor
Rough-in8/16/20188/17/20188/17/2018AFAIL
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
supply west shaft and exhaust fire damper is out of shaft wall. Fire damper must be in shaft wall assembly.
Ok to cover shaft wall at supply ducts west end of building
Rough-in8/15/20188/16/20188/16/2018AFAIL
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Need shaft framing for fire dampers installed per manufacturer instructions.