Final | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
|
Rough-in | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth Okay to cover ceiling at showers areas C
|
Rough-in | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth Okay to cover ceiling at area B first floor and rooms adjacent to fitness room second level.
|
Rough-in | 12/21/2018 | 12/24/2018 | 12/24/2018 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth okay to cover ceiling grid area A
ng grid area A
|
Rough-in | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PASS |
Troy James
|
|
|
###-#### Phone #: ###-#### Inspection requested via web by Amanda Farnsworth ok to cover ceiling at restrooms area A and C. link approved
|
Rough-in | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth Okay shafts first floor, cover ceiling restroom second floor area C. Okay boiler flues
|
Rough-in | 11/20/2018 | 11/21/2018 | 11/21/2018 | P | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth -1st floor area C elevator corridor ok for ceiling cover - 2nd floor area A and B ok for ceiling cover - 3rd floor training room and corridor on north east side ok for ceiling cover
|
Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | P | PART |
Troy James
|
|
|
ok access doors to fire dampers second level and ok to cover restroom ceiling at B section
|
Final | 11/13/2018 | 11/14/2018 | 11/13/2018 | A | CANC |
Troy James
|
|
|
Inspection on Micron bldg. 37 second floor bathroom. Requested by John McBride ###-#### Phone #: ###-#### Inspection requested via web by Amanda Farnsworth Rescheduled for afternoon
|
Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- area c 1st floor unisex bathrooms ok for cover- area c 2nd floor elevator corridors ok for cover also seen access door locations
|
Rough-in | 11/2/2018 | 11/2/2018 | 11/2/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- 3rd floor areas A & B from column L west ok for ceiling tiles register and flex all good- area C 1st floor SW entrance hard lid west wall lobby/desk area ok for sheet rock
|
Rough-in | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth ok shaft except erv andd shaft 6 and 7
|
Rough-in | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth Framing for fire dampers are not completed or not installed per fire damper installation instructions.
|
Rough-in | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth 3rd level ceiling ok to cover at area C
|
Rough-in | 10/12/2018 | 10/15/2018 | 10/15/2018 | A | CANC |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- called number on inspection notes and no one answered-
|
Rough-in | 10/4/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Troy James
|
|
|
|
Rough-in | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth ok to cover restrooms 3rd floor
|
Rough-in | 9/28/2018 | 10/1/2018 | 10/1/2018 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth Framing for fire/smoke damper does not meet manufacturer installations. 1 1/2" max space from framing to duct. Correction is for rtu 7 shaft
|
Rough-in | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PART |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
|
Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth ok ducts in shafts 6,7,3,5,9,11,12,13,15, erv 1
|
Rough-in | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PART |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth Ok to cover shaft 1,2,4,8,10 first floor
|
Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth ok framing bottom of shaft second floor, ok to cover ducts second floor
|
Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth supply west shaft and exhaust fire damper is out of shaft wall. Fire damper must be in shaft wall assembly. Ok to cover shaft wall at supply ducts west end of building
|
Rough-in | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth Need shaft framing for fire dampers installed per manufacturer instructions.
|