Final | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Jeremy lehosit- FINAL OK- CARD SIGNED
|
Final | 10/15/2018 | 10/16/2018 | 10/16/2018 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy lehosit- need to have engineer verify 4x10 register is ok in furnace closet if not will need to insulate supply and return in closet- need to secure secondary drain- need to finish insulation taping- ok for ceiling tiles
|
Rough-in | 9/16/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy lehosit- insulation will need all seams taped by final
|
Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Brian Scoles
|
|
|
R/I ok- need to tape seams on insulation better have done at final
|
Rough-in | 9/7/2018 | 9/10/2018 | 9/10/2018 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy lehosit- seal on duct ok- ok to insulate ducts- need 6" OSA duct ran to R/A plenum- need to fix rips in arma flex above furnace room- ok to insulate walls only in office space
|