Final | 12/4/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Brian Scoles
|
|
|
final ok- card signed
|
Final | 11/28/2018 | 11/30/2018 | 11/30/2018 | A | PART |
Brian Scoles
|
|
|
Please call Jason 30 minutes ahead and he will meet you onsite for access: ###-#### Phone #: ###-#### Inspection requested via web by Melissa Skinner- 2 pound meter set with no regulators installed for RTU or water heater- need to add regulators or contact intermountain gas and see if low pressure meter can be set instead of 2 pound meter- call in for final once resolved
|
Rough-in | 10/26/2018 | 10/30/2018 | 10/30/2018 | P | PART |
Brian Scoles
|
|
|
Please call Luke 30 mins ahead so that he can get you access Phone #: ###-#### Inspection requested via web by Melissa - R/i ok- need to seal weather tight and support ducting on roof- will look at exhaust fans at final- ok for cover- plumbing vent needs to be 10 feet away or 3 feet higher than economizer on roof
|
Pressure Test | 10/17/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Troy James
|
|
|
Please call Luke 30 min prior to arrival: ###-#### for access if needed. Phone #: ###-#### Inspection requested via web by Melissa Skinner 60# TEST
|