Final | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- final ok
|
Rough-in | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans
|
Pressure Test | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans - 20lb gas
|
Rough-in | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- bath exhaust 2nd floor pinched off- b vent at roof needs 1" clearance to combustibles- seal 2 boots 1st floor- frame out dryer duct and install nail plate at ceiling- wyes need insulated 1st floor- left correction notice first floor bedroom window
|