Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok
|
Final | 11/25/2018 | 11/26/2018 | 11/26/2018 | A | FAIL |
Brian Scoles
|
|
|
MEC AND FIREOL Phone #: ###-#### Inspection requested via web by Oleg Chervak- air balance doesnt meet 20% loss- rebalance to above 20% loss some rooms to low
|
Rough-in | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | PASS |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- R/I ok on hvac and fireplace
|
Rough-in | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- corrections not made- reinspection fee issued for ongoing corrections on house R/Is
|
Pressure Test | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass
|
Rough-in | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- fix all rips and tears on lineset- water heater b vent insulation shield needs to go to roof to short- fireplace flue does not have clearances per manufactures install at thimble to exterior, framing not big enough- need to seal fresh air seams on damper- need to support dryer vent every 4 feet- left correction notice front of furnace- reinspection fee issued (same ongoing corrections on house R/I inspections)
|