Final | 11/28/2018 | 11/28/2018 | 11/28/2018 | A | PASS |
Brian Scoles
|
|
|
gas piping range hood co ok- final ok
|
Rough-in | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | CANC |
Brian Scoles
|
|
|
Inspection requested via web by Aaron Alandt- R/I completed in morning along with gas pressure test
|
Pressure Test | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Brian Scoles
|
|
|
830-9 am for pressure test- 20lb gas pass
|
Rough-in | 9/21/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Brian Scoles
|
|
|
R/I on range hood ok- call in final inspection when range hood is installed
|
Pressure Test | 9/20/2018 | 9/20/2018 | 9/20/2018 | A | CANC |
Brian Scoles
|
|
|
meet at 830 to 9 to for gas test- wrong date i will reschedule for tomorrow morning
|
Final | 9/19/2018 | 9/20/2018 | 9/20/2018 | P | CANC |
Brian Scoles
|
|
|
installer Anas ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- n o final will be given until range hood is installed and hooked up- need to support 6" exhaust in attic before cover will be given- this should have been R/I inspection
|
Pressure Test | 9/19/2018 | 9/20/2018 | 9/20/2018 | P | NR |
Brian Scoles
|
|
|
installer Anas ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- still installing- gas wasnt under pressure- need to reschedule for tomorrow morning and i will be there between 830 and 9 am
|