Final | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Jack Reynolds
|
|
|
if questions call Ryan @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- gas piping ok- final ok no card to sign
|
Pressure Test | 10/5/2018 | 10/5/2018 | 10/5/2018 | A | PASS |
Brian Scoles
|
|
|
meet Ryan- ###-####- 60lb gas pass whole system- ok to cover- lab room will have access door installed for shutoff valve at final- need to look at roof piping/regulators on final inspection- no access pouring concrete around building
|
Pressure Test | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PART |
Brian Scoles
|
|
|
Pressure Test Witness - If questions call Ryan @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 60lb gas pass lab area wall up into ceiling- will test whole system when installed- ok to cover lab walls
|