Final | 9/25/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Brian Scoles
|
|
|
Field supervisor, Don Rapp, to meet you about 3:30. His number is ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- mini split final ok
|
Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | FAIL |
Brian Scoles
|
|
|
Please inspect after 9 AM. Phone #: ###-#### Inspection requested via web by Mary LaFayette- 3/8 tubing not exceptable condensate drain- need to run in 3/4" pvc from inside by head to exterior and down to ground
|