Final | 10/12/2018 | 10/12/2018 | 10/12/2018 | A | PASS |
Jack Reynolds
|
|
|
gas piping final for suite140 ok- card signed
|
Pressure Test | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pressure test ok on the rest of the gas piping to the water heater
|
Rough-in | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- R/I ok
|
Pressure Test | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PART |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pressure test ok for the make up air unit- still need to see test on gasline ran to water heater
|
Rough-in | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | NR |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- still need to see water heater gasline
|