Final | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jack Reynolds
|
|
|
Anytime Inspection requested via web by Floyd Floyd Peek - final ok
|
Pressure Test | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Eric Strole
|
|
|
Inspection requested via web by Floyd Floyd Peek-20 lb gas test pass.
|
Rough-in | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Eric Strole
|
|
|
Inspection requested via web by Floyd Floyd Peek-Equipment not set at this time.
|
Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | NR |
Jack Reynolds
|
|
|
Inspection requested via web by Floyd Floyd Peek- need man J- 20lb gas pressure not holding- need to see inertbtape on gas line- supply plenum needs insulated- support line set-
|