Final | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PASS |
Brian Scoles
|
|
|
Contact is Kenny ###-#### Phone #: ###-#### Inspection requested via web by Jamie Scibior- final ok- card signed
|
Final | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | FAIL |
Brian Scoles
|
|
|
Contact Owner Randy ###-#### for access Phone #: ###-#### Inspection requested via web by Jamie Scibior- needs shut off valve ahead of regulator and sediment trap installed before regulator- needs test port after regulator and a union installed for removal of regulator for maintenence 409.5.1 IFGC
|
Pressure Test | 10/12/2018 | 10/15/2018 | 10/15/2018 | A | PASS |
Brian Scoles
|
|
|
Contact en @ ###-#### Phone #: ###-#### Inspection requested via web by Jamie Scibior- 60lb gas pass- need sediment traps between shut off valves and appliance at final
|
Pressure Test | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | FAIL |
Brian Scoles
|
|
|
Please contact Ken at ###-#### for information on pressure test. Phone #: ###-#### Inspection requested via web by Jamie Scibior- gauge wont zero out- please install temp shutoff valve before gauge so can be used at pressure rather than draining whole system
|
Pressure Test | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Jamie Scibior- gauge at 49 psi- need inert tape on gas line where penetrates into building- sediment traps need to be installed between gas shut off and appliance- b vent needs insulation shields around pipe at ceiling with minimum clearnce of 1" and stubs down 2" below insulation
|