Mec-Aging Inspection | 5/15/2019 | 5/15/2019 | 5/15/2019 | | PASS |
Jack Reynolds
|
|
|
final ok
|
DOC - Permit Finaled | 5/15/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Jack Reynolds
|
|
|
final ok
|
Pressure Test | 10/4/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Jack Reynolds
|
|
|
Please call Sarah 30 minutes in advance for access at ###-#### and call Eddie with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- 20lb gas pressure test ok
|
Pressure Test | 10/3/2018 | 10/3/2018 | 10/3/2018 | A | FAIL |
Jack Reynolds
|
|
|
Please call Sarah 30 minutes in advance for access at ###-#### and call Eddie with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- test gauge needs to be a 30lb guage not a 100lb gauge- R/I of gas line and fryer ok
|