DOC - Permit Finaled | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Jack Reynolds
|
|
|
final ok
|
Pressure Test | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | FAIL |
Jack Reynolds
|
|
|
Dorris Phone #: ###-#### - need to add gas piping to permit before gas pressure test
|
Rough-in | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PART |
Jack Reynolds
|
|
|
Dorthyann Phone #: ###-#### - most corrections have been made and are ok - still need to see new duct work, dryer vent, range vent and a gas pressure test added to permit. then you need to schedule a pressure test on gas line
|
Rough-in | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | NH |
Jack Reynolds
|
|
|
Terek Phone #: ###-#### - no access to home - left notice on front door and re posted correction notice that was removed from the window
|
Final | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | FAIL |
Jack Reynolds
|
|
|
Teriek Phone #: ###-#### - Man J. needs to be approved by the city and stamped- supply and return duct in basment needs to be insulated- need transfer air into bedrooms- duct work/ dryer vent/ gas pressure test and range vent need to be added to permit- need to aslo see a plumbing permit pulled for all new plumbing- duct blast and air balance required
|
Final | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Terek Worley- duct work needs sealed at branch runs and floor boots- Need to have a Man J performed on mechanical work- need to see a pressure test on new gas line to range- need to add duct work,dryer vent, and gasline to permit- there is also a new water heater installed in basment that needs a plumbing permit
|