Final | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Ben Livingston
|
|
|
|
Rough-in | 3/12/2019 | 3/13/2019 | 3/13/2019 | A | PASS |
Ben Livingston
|
|
|
Inspect exhaust fan and heater in powder bath. Phone #: ###-#### Inspection requested via web by Brian Gifford
|
Pressure Test | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Ben Livingston
|
|
|
Gas line pressure test before bury Phone #: ###-#### Inspection requested via web by Brian Gifford 20lb and piping
|
Final | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | PASS |
Ben Livingston
|
|
|
Gas line pressure test before bury Phone #: ###-#### Inspection requested via web by Brian Gifford
|
Conference | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Gifford
|