Final | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Brian Scoles
|
|
|
Brenda Phone #: ###-####- final ok
|
Rough-in | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Brian Scoles
|
|
|
Brenda Phone #: ###-####- R/I ok
|
Pressure Test | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | CANC |
Brian Scoles
|
|
|
Pressure test Phone #: ###-#### >> Inspection requested via web by Lynn Johnston Inspection cancelled from web by: Lynn Johnston
|
Rough-in | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | CANC |
Brian Scoles
|
|
|
Rough- in Gas Pressure test Phone #: ###-#### >> Inspection requested via web by Lynn Johnston Inspection cancelled from web by: Lynn Johnston
|
Pressure Test | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Brian Scoles
|
|
|
Gas pressure test needed. Phone #: ###-#### Inspection requested via web by Lynn Johnston- 20lb gas pass- still need to look at R/A and dryer vent at final
|
Rough-in | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PART |
Ben Livingston
|
|
|
duck and floor-Brenda Phone #: ###-#### under floor duct ok, gas pressure test and dryer vent to be done later
|