Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberMEC18-05134
StatusFinaled
Name DIAMOND HEATING AND COOLING
Site Address 1738 S TRENT POINT WAY
Project Name 
Customer Number15847416
ePlanReviewNo
Description
Alteration or Repair: REPLACEMENT OF EXISTING FURNACE AND AC COIL WITH 96% FURNACE AND 14 SEER AC COIL
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/3/201812/4/201812/4/2018APASS
DetailsChad Schwendiman
please call Richard when 30 mins in route and he will meet you there and allow access. Phone #: ###-#### Inspection requested via web by Rick Montgomery
Final11/19/201811/26/201811/26/2018PNH
DetailsChad Schwendiman
please call our lead installer Sam when 30 mins in route. If at possible, asking for later afternoon inspection please- 3-5p Phone #: ###-#### Inspection requested via web by Rick Montgomery - Nobody home, Called installer when 30 mins out and left a voicemail. went by and waited 15 mins nobody showed up.
Final11/14/201811/14/201811/14/2018PCANC
DetailsChad Schwendiman
Please call Todd when 30-45 mins in route Phone #: ###-#### Inspection requested via web by Rick Montgomery - This was a conference
Conference11/14/201811/14/201811/14/2018PDONE
DetailsChad Schwendiman
Please call Todd when 30-45 mins in route Phone #: ###-#### Inspection requested via web by Rick Montgomery - Meet to discuss piping combustion air to outside
Final11/6/201811/9/201811/9/2018PFAIL
DetailsChad Schwendiman
PLEASE CALL HOMEOWNER DAVID WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery - Need to pipe combustion air directly to the outside with PVC, or duct cobustion air directly to the outside when furnace is installed in a bedroom closet
Final10/26/201810/29/201810/29/2018PFAIL
DetailsBen Livingston
PLEASE CALL HOMEOWNER DAVID WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery
need to witness flue pressure test, need to pipe combustion air directly to furnace so its sealed combustion and code compliant. condensate needs to be connected with a fitting into condensate line