Final | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PASS |
Brian Scoles
|
|
|
final ok
|
Final | 11/29/2018 | 11/30/2018 | 11/30/2018 | P | PART |
Brian Scoles
|
|
|
Inspection requested via web by Floyd Floyd Peek- Max still working on balance- he will note cfm on print and leave copy of airbalance onsite- I will final this permit out when go do other 2 mechanical inspections at this address-
|
Final | 11/27/2018 | 11/28/2018 | 11/28/2018 | P | NR |
Brian Scoles
|
|
|
Inspection requested via web by Floyd Floyd Peek- per phone call with Max airbalance not done has few more things to do- will reschedule when completed
|
Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Brian Scoles
|
|
|
meet Max at 9 am to go over job-- R/I ok- ok for ceiling tiles
|
Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | CANC |
Brian Scoles
|
|
|
Max has drawing of duct work and will draw ductwork on contractors copy this morning. Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek- rescheduled for 9 am tomorrow
|
Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | PASS |
Brian Scoles
|
|
|
Ready anytime Inspection requested via web by Floyd Floyd Peek- R/I ok-
|
Rough-in | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PART |
Brian Scoles
|
|
|
Need ok partial for bathrooms Inspection requested via web by Floyd Floyd Peek- R/I on 2 bathrooms ok- drawings show ducted returns but whats installed is plenum need to check with engineers on this- call in inspection when all rough in for duct is ready
|