Final | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Jack Reynolds
|
|
|
Majia Phone #: ###-#### - final ok
|
Final | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | FAIL |
Jack Reynolds
|
|
|
Mia Phone #: ###-#### - need balance report and duct blast doc. onsite - safety switch should be installed in the secondary condensate drain - need to see the drain pan condensate line removed from the main drain in the floor and a pan switch installed
|
Rough-in | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Jack Reynolds
|
|
|
Maya Phone #: ###-####- R/I ok- 5lb flue ok- 20lb gas pressure test ok
|
Rough-in | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | FAIL |
Jack Reynolds
|
|
|
Ramajla Phone #: ###-####- return downsatirs needs sealed- floor boots downstairs need seal to floor- need to see combustion air in mechanical closet for the furnace and water heater
|
Rough-in | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | FAIL |
Jack Reynolds
|
|
|
Mia Phone #: ###-####- crawl space still is not finished- need to have a city approved Man J onsite- secoundary drain is piped into drain and should have a wet switch installed
|
Pressure Test | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Jack Reynolds
|
|
|
Mia Phone #: ###-####- 20lb gas pressure test ok- gas piping R/I ok
|