Final | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Ben Livingston
|
|
|
Duct blast and final @ 10AM Phone #: ###-#### Inspection requested via web by Gary Reeves duct blast and final
|
Rough-in | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Final | 11/29/2018 | 11/30/2018 | 11/30/2018 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves manual J on site isnt the approved one, all metal duct in attic needs to be insulated
|
Rough-in | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves need approved manual J on site for rough-in inspection, dryer vent pipe is crushed going through top plate, coil in attic need auxiliary drain under it, attic access has a 2x4 blocking path to platform
|
Pressure Test | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves 20lb gas
|