Mec-Aging Inspection | 6/19/2020 | 6/19/2020 | 6/19/2020 | | PASS |
Jack Reynolds
|
|
|
WIP
|
Mec-Aging Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | | PASS |
Jack Reynolds
|
|
|
WIP
|
Mec-Aging Inspection | 12/20/2019 | 12/20/2019 | 12/20/2019 | | PASS |
Jack Reynolds
|
|
|
wip
|
Mec-Aging Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 | | DONE |
Jack Reynolds
|
|
|
R/I passed 11/13/18. BLD is still open. Schedule final inspection if mechanical work is finished. WIP
|
Mec-Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | | FAIL |
Jack Reynolds
|
|
|
This project still needs a final on the mechanical. Permit was last active on 11/13/18 at a R/I inspection. If work is finished schedule a final inspection.
|
Final | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | CANC |
Jack Reynolds
|
|
|
Marla Phone #: ###-####- should have been a R/I inspection
|
Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Jack Reynolds
|
|
|
Marla Phone #: ###-####- R/I ok
|