Final | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak - final ok - occ card signed
|
Final | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | FAIL |
Jack Reynolds
|
|
|
Oleg Phone #: ###-#### - A/C's need to be checked for level several units were off - fresh air taps at furnace need sealed - dryer locations need labels installed
|
Mec-Aging Inspection | 7/30/2019 | 7/30/2019 | 7/30/2019 | | DONE |
Jack Reynolds
|
|
|
WIP
|
Rough-in | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Jack Reynolds
|
|
|
Olg Phone #: ###-#### - west side duct seal ok - west side R/I ok for cover
|
Rough-in | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | FAIL |
Jack Reynolds
|
|
|
PART Phone #: ###-#### Inspection requested via web by Oleg Chervak - hvac duct work needs sealed - one fresh air duct needs flex connected to rigid duct work - line sets on 3rd floor need supported
|
Rough-in | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | NR |
Jack Reynolds
|
|
|
part Phone #: ###-#### Inspection requested via web by Oleg Chervak - talked with Monty and he stated he wasnt ready for R/I on the west side yet
|
Rough-in | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PART |
Jack Reynolds
|
|
|
PRE-ROCK, PARTIAL Phone #: ###-#### Inspection requested via web by Oleg Chervak - east side duct seal ok - east side only R/I ok
|
Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PART |
Jack Reynolds
|
|
|
PART Phone #: ###-#### Inspection requested via web by Oleg Chervak - BLD E - pre rock cover ok - R/I on exhausts and linesets
|