Final | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brian Scoles
|
|
|
Requesting a final inspection. Tim will be onsite and available to meet with the inspector. He can be reached at ###-#### Phone #: ###-#### Inspection requested via web by Aaron Whiteley- final ok- no card onsite to sign
|
Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Brian Scoles
|
|
|
Rough in inspection requested for the new TI in the West Boise maintenance shop Phone #: ###-#### Inspection requested via web by Aaron Whiteley- R/I ok
|
Pressure Test | 12/20/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Brian Scoles
|
|
|
Rough in inspection requested for the new TI in the West Boise maintenance shop Phone #: ###-#### Inspection requested via web by Aaron Whiteley- 60lb gas pass
|
Conference | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | DONE |
Brian Scoles
|
|
|
meet at 8 to 815- ###-####- discussed condensate drains and gas piping and condenser location
|