Final | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Brian Scoles
|
|
|
Final inspection on fireplace now that mantel is installed. Phone #: ###-#### Inspection requested via web by Tyler Stewart- final ok
|
Mec-Request for Extension | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Stewart- extension on permit ok- homeowner will call in inspection in next couple weeks
|
Pressure Test | 12/2/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Stewart- 20lb gas pass whole system
|
Conference | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | DONE |
Brian Scoles
|
|
|
Please call at least 30 minutes in advance, but I am available this afternoon to meet and discuss the proposed work before I get started. thank you. Phone #: ###-#### Inspection requested via web by Tyler Stewart- went over gas pipe sizing, installation, pressure testing required for gas test and scenarios for range fireplace and furnace/water heater locations
|