Final | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Brian Scoles
|
|
|
garage 2000 Phone #: ###-#### Inspection requested via web by ted roy- both units ok
|
Final | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | FAIL |
Brian Scoles
|
|
|
Final inspection on duplex. Garage codes are 1000 and 2000 Phone #: ###-#### Inspection requested via web by ted roy- west unit ok- east unit ok but need fireplace installation instructions onsite to check matnel height none could be found
|
Mec-Aging Inspection | 8/1/2019 | 8/1/2019 | 8/1/2019 | | CANC |
Brian Scoles
|
|
|
WIP
|
Pressure Test | 12/19/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Brian Scoles
|
|
|
20lb gas pass both units
|
Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Brian Scoles
|
|
|
Duct blaster test 9:00. rough in, gas pressure test, flue and fireplace inspection. Phone #: ###-#### Inspection requested via web by ted roy- R/I both units ok- duct blast both units ok- fireplace R/I east unit ok
|