Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Brian Scoles
|
|
|
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace and hvac final ok
|
Rough-in | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | PASS |
Jack Reynolds
|
|
|
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak - fireplace and hvac R/I ok
|
Pressure Test | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak - 5lb flue pressure test ok - 20lb gas pressure test ok
|
Rough-in | 1/2/2019 | 1/3/2019 | 1/3/2019 | P | FAIL |
Jack Reynolds
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak - Man J doesnt match whats installed - crawl needs finished - supply pipe in attic needs insulated - fireplace needs gas piping ran and pressure test - need to see non combustibles installed around fireplace - fireplace framing needs to be 47" 3/8 - fireplace flue needs insulation sheild adjusted
|