Final | 2/4/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Jack Reynolds
|
|
|
Inspection requested via web by Konrad Swartz - final ok
|
Final | 2/4/2019 | 2/5/2019 | 2/4/2019 | A | CANC |
Jack Reynolds
|
|
|
>> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|
Final | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PART |
Jack Reynolds
|
|
|
Inspection requested via web by Konrad Swartz - upstairs units had access- need to finish filling out duct blast stickers upstairs- still need access to units downstairs- dyrer vent done by other needs finished
|
Conference | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Jack Reynolds
|
|
|
Duct Blast Inspection requested via web by Konrad Swartz -all units duct blast ok
|
Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Jack Reynolds
|
|
|
Rough in and Duct Blast 9:30 Inspection requested via web by Konrad Swartz - R/I ok - unit 102 duct blast ok - air balance will be ready to check for final
|
Rough-in | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PART |
Jack Reynolds
|
|
|
Inspection requested via web by Konrad Swartz - Man J needs to be stamped by the city and onsite - range hood vent needs to be smooth walled pipe - dryer vent needs to be installed for common laundry room and needs a backdraft damper
|
Final | 1/14/2019 | 1/16/2019 | 1/16/2019 | A | CANC |
Jack Reynolds
|
|
|
The Builder and Property Manager are requesting 8:30 to 10:30 AM as these are occupied >> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|
Final | 1/8/2019 | 1/9/2019 | 1/9/2019 | P | FAIL |
Jack Reynolds
|
|
|
Property Manager is requesting 3 pm for both buildings Inspection requested via web by Konrad Swartz - need man J stamped and approved onsite - need to add bathroom exhaust fan and duct work to permit - linesets need UV protection - condensate lines need extended down to ground from the 2nd floor
|