Final | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Ben Livingston
|
|
|
Please call James at ###-#### with any questions. Manual J is located at the basement furnace, thanks. Inspection requested via web by 4 Seasons
|
Final | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | CANC |
Ben Livingston
|
|
|
Manual J is by the basement furnace. Please call James at ###-#### with any questions, thanks. >> Inspection requested via web by 4 Seasons Inspection cancelled from web by: 4 Seasons
|
Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Ben Livingston
|
|
|
Please do a rough-in inspection. Call James at ###-#### with any questions, thanks. Inspection requested via web by 4 Seasons fresh check fresh air to return duct at final
|
Rough-in | 1/21/2019 | 1/22/2019 | 1/22/2019 | P | NR |
Ben Livingston
|
|
|
Please do a rough-in and pressure witness. If there are any questions, call James at ###-####, thanks. Inspection requested via web by 4 Seasons need to finish crawl
|
Pressure Test | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Ben Livingston
|
|
|
Please do a rough-in and pressure witness. If there are any questions, call James at ###-####, thanks. Inspection requested via web by 4 Seasons 20lb, 5lb flue
|