Final | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Jack Reynolds
|
|
|
I thought we had already passed the final once the pressure test was done. Please let me know if anything else needs to be done to complete this inspection. Phone #: ###-#### Inspection requested via web by Kathryn Martin - final ok
|
Pressure Test | 1/29/2019 | 1/29/2019 | 1/29/2019 | A | PASS |
Jack Reynolds
|
|
|
call 1 hour prior to arrival Tony will get gas line under pressure and call you for test Phone #: ###-#### Inspection requested via web by kelly Martin - final ok
|
Final | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | FAIL |
Jack Reynolds
|
|
|
Please call Kathryn 1 hour prior to arrival. Phone #: ###-#### Inspection requested via web by kelly Martin - need to a 60 lb gas pressure test on new gasline to furnace and water heater - water heater flue needs an insulation shield installed in attic and needs 1 " clearances at roof - duct insulation at furnace needs to be installed per manufactures installation instructions 3/4 air gap to achieve R value - gas regulator needs a test port installed after first shut off valve and before reg - line set needs supported in crawl
|