Final | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Jack Reynolds
|
|
|
Jake is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist - final ok - Occ card will be signed when other mechanical permit passes final inspection
|
Final | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | CANC |
Brian Scoles
|
|
|
Jake is the contact Phone #: ###-#### Inspection requested via web by stan lillquist0 see R/I notes-
|
Rough-in | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | FAIL |
Brian Scoles
|
|
|
Jake is the contact Phone #: ###-#### Inspection requested via web by stan lillquist- unit heater fluing needs to be minimum 5 feet from paraphet wall flues installed are all 4 feet ish- on sheet m-3 note 13 gives dimensions per engineer to maintain 5 feet-
|
Mec-Aging Inspection | 8/27/2019 | 8/27/2019 | 8/27/2019 | | CANC |
Brian Scoles
|
|
|
needs called in for inspection when ready- WIP
|