Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Brian Scoles
|
|
|
call for access-John Phone #: ###-####- pellet stove final ok
|
Conference | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | DONE |
Brian Scoles
|
|
|
John Phone #: ###-####- discussed flue options with homeowner
|
Conference | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | DONE |
Brian Scoles
|
|
|
John Phone #: ###-####- discussed pellet stove install- will need installation instruction onsite- owner will reschedule when stove is onsite-
|