Final | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Ben Livingston
|
|
|
Inspection requested via web by jeff jedlick
|
Rough-in | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Ben Livingston
|
|
|
I will be here Inspection requested via web by jeff jedlick
|
Rough-in | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | FAIL |
Ben Livingston
|
|
|
Call with any questions 208 631 6575 Inspection requested via web by jeff jedlick need approved manual j on site, insulation shield needs to drop to the top of drywall, bed room needs return path
|
Pressure Test | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Ben Livingston
|
|
|
Call with any questions 208 631 6575 Inspection requested via web by jeff jedlick 20lb gas 5lb flue
|