Mec-Aging Inspection | 6/15/2020 | 6/15/2020 | 6/15/2020 | | FAIL |
Jack Reynolds
|
|
|
No Calls. Permit has not been active since 9-17-19. Schedule inspection if work is finished. Permit will expire at next mechanical aging if not active.
|
Mec-Aging Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 | | FAIL |
Jack Reynolds
|
|
|
Permit has not been active since 9-17-19 and no calls. Schedule inspection if work is finished.
|
Mec-Aging Inspection | 12/16/2019 | 12/16/2019 | 12/16/2019 | | PASS |
Jack Reynolds
|
|
|
WIP
|
Mec-Aging Inspection | 9/16/2019 | 9/16/2019 | 9/16/2019 | | CANC |
Chad Schwendiman
|
|
|
WIP
|
Rough-in | 3/13/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Jack Reynolds
|
|
|
Please contact Bill on your way out. ###-####. Phone #: ###-#### Inspection requested via web by Vance Poulsen - R/I ok
|
Rough-in | 2/6/2019 | 2/7/2019 | 2/7/2019 | P | FAIL |
Jack Reynolds
|
|
|
Please call Bill on your way out. ###-#### Phone #: ###-#### Inspection requested via web by Vance Poulsen - flec ducting needs to be installed per manufactures spec (zip tie outer liner) - north flex duct needs to be replaced with outer liner installed - one supply duct needs insulation installed - b vent needs 1" clearances to dry wall - return duct needs to be installed in new location if being moved from current location - bathroom exhaust needs to be finished - return duct in attic is being smashed by trusses and needs fixed - furnace and water heater flue needs 3 screws
|
Conference | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | NH |
Jack Reynolds
|
|
|
Please contact Bill on your way out. ###-####. Use side gate on south side of house. Phone #: ###-#### Inspection requested via web by Vance Poulsen - no access to home called phone number in notes - left notice on front door
|