Final | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Chad Schwendiman
|
|
|
Afternoon Inspection Please Phone #: ###-#### Inspection requested via web by Randy Hart
|
Final | 4/3/2019 | 4/5/2019 | 4/5/2019 | A | FAIL |
Jack Reynolds
|
|
|
code 2468 Phone #: ###-#### Inspection requested via web by Randy Hart - water heater flue and gas line need finished - duct blast document at furnace says system failed -line set UV protection - system needs air balanced and document onsite
|
Rough-in | 2/19/2019 | 2/25/2019 | 2/25/2019 | A | PASS |
Jack Reynolds
|
|
|
code 2468 Phone #: ###-#### Inspection requested via web by Randy Hart - R/I ok
|
Pressure Test | 2/19/2019 | 2/25/2019 | 2/25/2019 | A | PASS |
Jack Reynolds
|
|
|
code 2468 Phone #: ###-#### Inspection requested via web by Randy Hart - 20lb gas pressure test ok - tagged meter location
|