Final | 4/22/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Jack Reynolds
|
|
|
Final for ducting that we installed. Furnace was existing. Call Brett with any questions ###-#### Phone #: ###-#### Inspection requested via web by Brett Shannon - final ok
|
Rough-in | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | PASS |
Jack Reynolds
|
|
|
Ductwork installation only, manual J onsite, please call Brett with any questions ###-#### Phone #: ###-#### Inspection requested via web by Brett Shannon - 20lb gas pressure test ok to range - R/I ok
|