Final | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Chad Schwendiman
|
|
|
Please contact Daniel on site - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
|
Rough-in | 3/7/2019 | 3/8/2019 | 3/8/2019 | P | PASS |
Brian Scoles
|
|
|
Please inspect as close to 1:00 PM as possible. Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- R/I ok- exhaust fan issues have been taken care of
|
Conference | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PART |
Brian Scoles
|
|
|
Pat-GC wants to talk about some corrections that the HVAC co can''t fix Phone #: ###-####- 2nd floors 4 units R/I ok- 1st floor 4 units still need framing/sheetrock installed- rest of 1st floor ok- walked job with Daniel and Bill- man j need to have equipment install on man j by final different brands
|
Rough-in | 2/27/2019 | 2/28/2019 | 2/28/2019 | P | FAIL |
Brian Scoles
|
|
|
Please call Dan on your way. ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- need to submit manual j to city and have aopproved manual j onsite for inspection- all exhaust fans need to be ran per approved prints per detail A- left correction notice first floor window
|