Pressure Test | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PASS |
Eric Strole
|
|
|
Please call 1 hour prior to arrival. They are starting this job at 8AM, should be ready for pressure around 10AM. Call Kelly Buel ###-#### he is the lead tech Phone #: ###-#### Inspection requested via web by kelly Martin-20 lb gas test pass.
|
DOC - Permit Finaled | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PASS |
Eric Strole
|
|
|
|
Pressure Test | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | FAIL |
Eric Strole
|
|
|
Please call 1 hour prior to arrival. They are starting this job at 8AM, should be ready for pressure around 10AM. Call Kelly Buel ###-#### he is the lead tech Phone #: ###-#### Inspection requested via web by kelly Martin-Gauge will not zero out.
|