Final | 5/17/2019 | 5/20/2019 | 5/20/2019 | A | PASS |
Jack Reynolds
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen - final ok - will sign occ card when 2nd mech permit from other contractor for gas lines is finaled
|
Rough-in | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jack Reynolds
|
|
|
cover inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen - ceiling cover ok
|
Rough-in | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Jack Reynolds
|
|
|
rough Phone #: ###-#### Inspection requested via web by Brandon Sorensen - R/I ok
|
Rough-in | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | FAIL |
Jack Reynolds
|
|
|
sealer inspection - call brandon @ ###-#### Phone #: ###-#### Inspection requested via web by Brandon Sorensen - duct seal ok - inspection failed because there is non rated materials in return plenum( roof drains) and if any data cables or t stat wiring to be installed need to be approve materials
|