Final | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | PASS |
Jack Reynolds
|
|
|
Pressure test and final on gas line -- Call Bob ###-#### in route --Tech on site --should be done 1PM Phone #: ###-#### Inspection requested via web by Justin Osterhout
|
Pressure Test | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | PASS |
Jack Reynolds
|
|
|
Pressure test and final on gas line -- Call Bob ###-#### in route --Tech on site --should be done 1PM Phone #: ###-#### Inspection requested via web by Justin Osterhout - 20lb gas pressure test ok
|