Final | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PASS |
Jack Reynolds
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen - final ok
|
Rough-in | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Jack Reynolds
|
|
|
Rough in Phone #: ###-#### Inspection requested via web by Brandon Sorensen - R/I ok
|
Rough-in | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | PART |
Jack Reynolds
|
|
|
cover inspection - call scotty Phone #: ###-#### Inspection requested via web by Brandon Sorensen - duct seal on furnace in back ok - R/I cover of duct ok - line set and condensate still needs to be ran but will have access to be seen and an access door will be installed for electrical to air handler
|
Rough-in | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | PART |
Jack Reynolds
|
|
|
re-inspect - call R Jay Phone #: ###-#### Inspection requested via web by Brandon Sorensen - bathroom cover ok
|
Rough-in | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | NR |
Jack Reynolds
|
|
|
hard lids for bathrooms Phone #: ###-#### Inspection requested via web by Brandon Sorensen - two existing bathroom fans needs ducted out the roof
|