Final | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Jack Reynolds
|
|
|
Please schedule in the morning and call Janet (###-####) prior to showing up, Thank you. Phone #: ###-#### Inspection requested via web by Tyler Collado - furnace ac coil co ok
|
Final | 3/20/2019 | 3/25/2019 | 3/25/2019 | A | FAIL |
Jack Reynolds
|
|
|
Please call Mike (###-####) 30 minutes prior to showing up, Thank you. Phone #: ###-#### Inspection requested via web by Tyler Collado - duct insulation needs to be installed per manufactures spec. Insulation needs 3/4 air gap to achieve r value
|