Final | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PASS |
Brian Scoles
|
|
|
Tamra Phone #: ###-####- underground gas piping final ok
|
Final | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PART |
Brian Scoles
|
|
|
Final inspection needed for Innovative Air gas piping you may contact Karl at ###-#### thank you:) Phone #: ###-#### Inspection requested via web by Karl Hestekin- contractor needs to attach this permit to right building per to final out- 60lb gas pass underground from meter location south around building then east and then north to MAU unit- underground piping ok- ok to backfill
|